Construction Works of Two Integrated Teaching Buildings
Ground Investigation for the Slope near University Health Centre
Ground Investigation for the Slope near Hang Seng Hall at United College
Slope Formation and Stabilization Works for Forming a Pedestrian Pavement along Central Avenue
Drainage Diversion Works - Access Road Near Chung Chi College Staff Quarters G
Protection and Migration of House Swift Nesting on Facades of the University Library
Tree Transplanting Works for the Student Amenity Centre Chung Chi Tang and Elizabeth Luce Moore Library
2 x 300 Place Student Hostel adjacent to Chan Chun Ha Hostel at Residence Road
Slope Improvement Works at the East of Station Road, near Cybress Lodge (Feature 7NE-C/F179)
Slope Improvement Works below Chung Chi Colleage Staff Quater D (Feature 7NE-C/F16)
Slope Improvement Works at the East of Ya Qun Lodge (Feature 7NE-C/F156)
New Buildings Sprout Up on Campus
Temporary Traffic Arrangement at Campus Circuit and Opening Hours of Eastern Gate
CEDD's Slope Stabilization at Cheung Shue Tan Near Shaw College