Mission & Responsibilities
New Chapel to Theology Building
Construction Works of Centralized General Research Laboratory Complex (Block 1) in Area 39
Construction Works for Student Amenity Centre
Construction of University Library Extension and Temporary Re-organization of Car Parking Spaces at John Fulton / Security & Transport Building and Central Avenue
Upgrading Works of Government Sewerage Pumping Station and Main Pipe by Drainage Services Department
Temporary Traffic Arrangement at Campus Circuit
Construction of Access Linking Ho-Sin Hang Engineering Building to Centralized Science Laboratories Building
Extension of Cover to Existing Steel Covered Walkway at Bus Station near MTR University Station
Utilities Diversion Works - Tin Ka Ping Building Near Central Avenue
Construction Works of Two Integrated Teaching Buildings
Slope Formation and Stabilization Works for Forming a Pedestrian Pavement along Central Avenue
Protection and Migration of House Swift Nesting on Facades of the University Library
2 x 300 Place Student Hostel adjacent to Chan Chun Ha Hostel at Residence Road
New Buildings Sprout Up on Campus
CEDD's Slope Stabilization at Cheung Shue Tan Near Shaw College