Mission & Responsibilities
Notice of Temporary Closure of Public Passage and the Lift between G/F and 4/F of Pentecostal Mission Hall Complex (Low Block)
Temporary Pedestrian Path Diversion for Slope Improvement Works at the East of Basic Medical Science Building Teaching Annex
Renovation for Campus Radio on 3/F of Benjamin Franklin Centre
Notice of Mall Piazza Paving Works
C.W. Chu College (Presentation)
Notice of Temporary Closure Traffic Road and Pedestrian Pavement at Residence Road and Campus Circuit North for Underground LPG Piping Work from Residence No.10 to C.W. Chu College site
Temporary Traffic Arrangement for Loading/Unloading, Road Work and Hoarding Removal Works at Residence Lane 1 for Wu Yee Sun College
Temporary Traffic Arrangement for Drainage Work of 300 Place Student Hostel at Campus Circuit North (C. W. Chu College)
Campus Development Sharing Session - 22 November 2012
Pedestrian Pavement & Storm Water Drainage Improvement Works along Campus Circuit West & North
Additional Public Circulation Lift at Pentecostal Mission Hall Complex (Low Block) - Temporary Traffic Arrangement
Temporary Traffic Arrangement for Underground Services Construction at Residence Lane 1 for Wu Yee Sun College
Additional Public Circulation Lift at Pentecostal Mission Hall Complex (Low Block)
Route to Yasumoto International Academic Park, Wu Ho Man Yuen Building and An Integrated Teaching Building
Temporary Traffic Arrangement for Drainage Work of Wu Yee Sun College at Campus Circuit West
Site Formation and Foundation Works at C. W. Chu College
Photo Montages - Repainting of University Library and Tin Ka Ping Building
Upgrading Works of Government Sewerage Pumping Station and Main Pipe by Drainage Services Department