Item Tender No. Description
2011-12-06

Structural Engineering Services
Spatial Reorganization of Existing University Library and
Tin Ka Ping Building in merging with the New Library Extension

2011-12-05
Structural Engineering Consultant Addition of Passenger Lift to
Pentecostal Mission Hall Complex (Low Block)
2011-12-04
Supply and Install Loose Furniture (Stage 3) to
Centralized General Research Laboratory Complex Block 1 at Area 39
2011-12-03

Supply and Install Loose Furniture (Stage II) to
Centralized General Research Laboratory Complex Block 1 at Area 39

2011-12-02
Supply and Install Audio-Visual System to
Centralized General Research Lab Complex Block 1 at Area 39
2011-12-01
Improvement Works to Benjamin Franklin Centre - Phase 2
2011-11-02
A&A Works for Existing Staff and Student Centre at New Asia College
2011-11-01
A&A Works for Ya Qun Lodge Multi-Purpose Learning Centre at Shaw College
2011-10-06

Supply and Installation of Ceremony Plaque to
300-place Student Hostel at Campus Circuit North (C W Chu College)

2011-10-05

Improvement Works for Hostel 2 & 3 at LG2/F, S H Ho College

2011-10-04

Hoarding Works for 300-Place Student Hostel at
Campus Circuit North (C W Chu College)

2011-10-03

Supply and Install Loose Furniture to Medical Library at
2/F of Clinical Sciences Building, PWH

2011-10-02

Supply and Install Loose Furniture to
Centralized General Research Laboratory Complex Block 1 at Area 39

2011-10-01

Lift Installation for the Extension and Spatial Reorganization of
Student/Staff Canteen at Staff Student Centre ¡V Leung Hung Kee Building,
New Asia College ¡V Tender B

2011-09-03

Supply and Installation of Colour Graphic Banner for
Roof and External Wall of Chan Chun Ha Hall

2011-09-02

Design, Supply and Install Signs and Plaques for S H Ho College

2011-09-01

Supply and Install Signage for Hostel 1, 2 & 3
(Morningside College and S H Ho College) for
3x300-Place Student Hostels at University Avenue at Site A

2011-08-06

Take Down Existing Bookshelves and Associated Works for University Library

2011-08-05

Supply and Installation of Status Stand and Plaque for
Chan Chun Ha Hall G/F

2011-08-04

Supply and Installation of Audio-Visual System for
New Chapel at Chung Chi College ¡V Tender A

2011-08-03

Fitting Out Works to Master¡¦s Quarter at Morningside College

2011-08-02

Delivery and Supply of Microwave Ovens for Pantries
3x300-Place Student Hostels at Site A

2011-08-01

Supply and Install AV Equipment for the Canteen for
the Hostel 1 (Morningside College) 3x300-Place Student Hostels at
University Avenue at Site A

2011-07-11

Delivery, Supply and Installation of Instant Hot Water Drinking Boilers for
3x300-Place Student Hostels at Site A

2011-07-10

Supply and Installation of 46" Plasma / LCD Flat TV for
Medical Library at 2/F, Clinical Sciences Buildings, PWH

2011-07-09

Model Making for University Station - Proposed New Upline Entrance in CUHK

2011-07-08
Improvement Works for BFC Courtyard ¡V Phase I
2011-07-07

Topographic Survey on C W Chu College near Campus Circuit, CUHK

2011-07-06

Ground Investigation Works for C W Chu College near Campus Circuit

2011-07-05

Interior Fitting-out Works for New Chapel to Theology Building

2011-07-04

Supply and Install Curtain for 1,500-Place Student Hostels at
University Avenue at Site A

2011-07-03

Supply and Install Furniture for Common Area, Warden & Master Quarter for 1,500-Place Student Hostels at University Avenue at Site A

2011-07-02

Supply and Install Office and Classroom Furniture for
1,500-Place Student Hostels at University Avenue at Site A

2011-07-01

A&A Works for New Advanced Ophthalmic Training and
Education Centre on Roof of Hong Kong Eye Hospital,
Argyle Street, Kowloon

2011-06-02
Supply and Install Loose Furniture to MIT Department at 2/F CSB at PWH
2011-06-01
Construction of Signboards and Signages for Run Run Shaw Science Building
2011-05-12

Supply and Installation of Laundry Equipment for Hostels 2 & 3 at Site A

2011-05-11

Supply and Installation of Laundry Equipment for Hostel 1 at Site A

2011-05-10

Supply and Install Bedroom Furniture for Hostel 2&3 (S. H. Ho College) for
1,500-Place Student Hostel at University Avenue at Site A

2011-05-09

Supply and Install Bedroom Furniture for Hostel 1 (Morningside College) for 1,500-Place Student Hostel at University Avenue at Site A

2011-05-08

Alteration and Addition Works to Existing
Fung King Hey and Leung Kau Kui Building ¡V Tender B

2011-05-07

Nominated Sub-Contract for ACMV Installation
Two Integrated Teaching Buildings

2011-05-06

Nominated Sub-Contract for Electrical Installation
Two Integrated Teaching Buildings

2011-05-05

Nominated Sub-Contract for Electrical Installation Student Amenity Centre

2011-05-04

Nominated Sub-Contract for Fire Services Installation Student Amenity Centre

2011-05-03

Nominated Sub-Contract for Lift Installation Student Amenity Centre

2011-05-02

Nominated Sub-Contract for HVAC Installation Student Amenity Centre

2011-05-01
Main Contract for Student Amenity Centre
2011-04-05

Supply and Install Kitchen & Ventilation System for
Canteen at 300-Place Student Hostel of Morningside College at Central Campus

2011-04-04

Supply and Install Kitchen & Ventilation System for
Canteen at 2x300-Place Student Hostel of S H Ho College at Central Campus

2011-04-03

Major Renovation and Spatial Reorganization of 2/F
Clinical Sciences Building, Prince of Wales Hospital

2011-04-02

Nominated Sub-Contract (NSC) for ACMV Installation
Two Integrated Teaching Buildings

2011-04-01

Nominated Sub-Contract (NSC) for Design, Supply
and Installation of Building Envelope System
Two Integrated Teaching Building

2011-03-06

Supply and Installation of Floor Rug to Cafe at Level 3, Cheng Yu Tung Buildin

2011-03-05

Supply and Installation of Floor Mat at Main Entrance of Li Dak Sum Building

2011-03-04

Supply and Install Furniture for Chan Chun Ha Hall

2011-03-03

Upgrading Works for Sewers under the MTRC
Railway at Bridge No. 1

2011-03-02

Supply, Delivery and Installation of Lecture Theatre Seating ¡V
Spatial reorganization of the teaching facilities and learning commons of
Faculties of Medicine at 2/F of Clinical Science Building at Price of Wales Hospital

2011-03-01

Structural Engineering Services Alteration and Addition Works to the Existing
Staff Student Centre at New Asia College

2011-02-05

Nominated Sub-Contract for Lift Installation
A & A Works on Roof of Hong Kong Eye Hospital

2011-02-04

Main Contract for Two Integrated Teaching Building

2011-02-03

Nominated Sub-Contract for Lift Installation
An Integrated Teaching Building

2011-02-02

Nominated Sub-Contract for Lift Installation
Two Integrated Teaching Buildings

2011-02-01

Nominated Sub-Contract for Fire Services Installation
Two Integrated Teaching Building

2011-01-03

Refurbishment of the Lift Interior at Lady Shaw Building

2011-01-02

Supply and Install Signage for Chan Chun Ha Hall

2011-01-01

Drainage Improvement Works at Northern Campus near Area 39

Photo Montages - Repainting of University Library and Tin Ka Ping Building

Student Amenity Centre - Temporary Traffic Arrangement

2x300 Place Student Hostels - Temporary Traffic Arrangement

Wu Yee Sun College Hostel at Residence Lane 1 - Temporary Traffic Arrangement

An Integrated Teaching Building - Temporary Road Traffic Diversion

Staff Student Centre - Leung Hung Kee Building at New Asia College - Temporary Road Traffic Diversion

Two Integrated Teaching Buildings - Notice of Construction Work near Chung Chi College Quarter Block S

Two Integrated Teaching Buildings - Temporary Traffic Arrangement

Notice of Temporary Footpath Diversion for Student Amenity Centre

Notice of Temporary Road Closure Arrangement in Central Avenue

Notice of Temporary Hoarding Work for University Library Extension

2x300 Place Student Hostels - Temporary Road Traffic Diversion

An Integrated Teaching Building - Notice of Restricted-Hour Construction Work at the Corner of Station Road and Bridge No.1

Two Integrated Teaching Buildings - Temporary Closure of Chung Chi Student Piazza

New Chapel - Temporary Closure of Carpark

Two Integrated Teaching Buildings - Temporary Closure of Pedestrian Pavement

Two Integrated Teaching Buildings - Temporary Closure of Road and Traffic Diversion

An Integrated Teaching Building - Temporary Closure of Road and Traffic Diversion

Upgrading Works for Sewers under MTRC Railway at Bridge No. 1 - Temporary Traffic Arrangement

MTR New Exit at University Station - Temporary Closure of Carpark

Upgrading Works for Sewers under MTRC Railway at Bridge No. 1 - Temporary Traffic Arrangement

Upgrading Works for Sewers under MTRC Railway at Bridge No. 1

Upgrading Works of Government Sewerage Pumping Station and Main Pipe by Drainage Services Department - Temporary Closure of Road and Traffic Diversion

Upgrading Works of Government Sewerage Pumping Station and Main Pipe by Drainage Services Department

Temporary Traffic Arrangement at Campus Circuit

 


Copyright 2012 Campus Development Office, The Chinese University of Hong Kong